Residential

Residential Housing & Apartment Developments – New Builds

BHA Construction has successfully delivered a wide range of high-quality residential housing and apartment developments across Dublin, Kilkenny, Carlow, and Laois. Our work spans both social and private housing schemes, built to the highest standards of craftsmanship, compliance, and sustainability. We bring a collaborative, solutions-driven approach to each project, ensuring timely delivery and long-term value for clients, end-users, and communities.

Coneyboro Phase 1, Athy, Co. Kildare
Coneyboro Phase 1, Athy, Co. Kildare
Coneyboro Phase 1, Athy, Co. Kildare

Coneyboro Phase 1, Athy, Co. Kildare

New Residential Housing Development

New Residential Housing Development of 35 homes.

Value Of Work

€TBC

Year

July 2025

Duration

27 months

Phase 1 at Coneyboro, Athy, Co. Kildare – a growing, sustainable community being delivered by BHA Construction as both developer and main contractor. Phase 1 includes 35 new homes, a mix of high-quality semi-detached and terraced units, all designed to the highest modern standards — including an impressive A2 BER rating for superior energy performance. As part of this phase, 9 terraced homes have been delivered for Clúid Housing, providing vital social housing for the local community — a key part of our commitment to delivering inclusive, long-term housing solutions. Following the completion of Phase 1, Phases 2 and 3 will add a further 52 homes, bringing the overall development to a total of 87 new units in Athy.

Radharc na Mara (Sea View), Rosslare Harbour, Co. Wexford

Radharc na Mara (Sea View), Rosslare Harbour, Co. Wexford

Residential Housing Development

New Residential Housing Development of 28 Social homes.

Value Of Work

€TBC

Year

2025

Duration

14 months

Our Radharc na Mara development – meaning “View of the Sea” – sits proudly in Ballygillane Big, Rosslare Harbour, Co. Wexford and lives up to its name with panoramic sea views that are second to none. This residential scheme for Co-operative Housing Ireland (CHI) consists of 28 homes – a carefully considered mix of 2 and 3 bedroom homes, duplexes, and apartments, designed to meet a variety of housing needs. A standout feature of the development is the large adjoining public amenity area, which will include a community park and children’s play space – a valuable addition for residents and the wider community. Completion June 2025

Mont Clare, 126-128 Harolds cross Rd, Dublin 6W
Mont Clare, 126-128 Harolds cross Rd, Dublin 6W
Mont Clare, 126-128 Harolds cross Rd, Dublin 6W

Mont Clare, 126-128 Harolds cross Rd, Dublin 6W

New Residential Apartment Development

Demolition of existing and construction of 35 apartments over 2 blocks with balconies.

Value Of Work

€9.8m

Year

2025

Duration

20 months

Demolition of existing building and construction of an infill residential development of 34 apartments spread over two blocks consisting of 35 apartments over 4 Storeys. A mix of one and two bedroom and studio apartments. Most apartments with balconies. 30 car parking spaces, bicycle parking, refuse store and landscaped courtyard. All apartments have heat pumps.

Rosemount Gate, 153 - 155 Harolds Cross Rd, Dublin 6W

Rosemount Gate, 153 - 155 Harolds Cross Rd, Dublin 6W

Apartment Development

Enabling works, demolition ex. structure, site works for construction of 35 no. apartments

Value Of Work

€6.7m

Year

2025

Duration

20 months

A single four-storey over basement apartment building providing 35 no. apartments. Scope of works included; Enabling works, demolition existing structure and site works.

Cuanahowan, Tullowbeg, Tullow, Carlow
Cuanahowan, Tullowbeg, Tullow, Carlow
Cuanahowan, Tullowbeg, Tullow, Carlow

Cuanahowan, Tullowbeg, Tullow, Carlow

New Residential Housing Development of 48 social housing units.

Year

2025

Duration

20 months

BHA were both developer and main contractor - Architect CDP Architecture. We are proud to be nearing completion of the Cuanahowan development in Tullow, Co. Carlow, for Co-operative Housing Ireland (CHI). This project delivered 48 high-quality social housing units, including a mix of 2 and 3-bedroom homes — Semi-D's, Terraces, and Bungalows — designed for families to become thriving communities.

Kilminchy, Portlaoise
Kilminchy, Portlaoise
Kilminchy, Portlaoise

Kilminchy, Portlaoise

Residential Social Housing development

BHA built 43 social housing units in Portlaoise for Clúid Housing. The development included a mix of detached and semi detached homes.

Value Of Work

€7.3m

Year

2022

A residential housing development of 43 social housing units, a mix of detached and semi-detached homes built for Clúid Housing, an independent, not-for-profit charity organisation.

Ballyknockan Manor, Leighlinbridge, Co. Carlow
Ballyknockan Manor, Leighlinbridge, Co. Carlow
Ballyknockan Manor, Leighlinbridge, Co. Carlow

Ballyknockan Manor, Leighlinbridge, Co. Carlow

Residential Social Housing Development

Value Of Work

€6.5m

Year

2025

Duration

24 months

Social Housing Development for Carlow County Council comprising 37 Social Housing units handed over w/c 12th May 2025. This residential development is made up of 10 semi-detached 2 and 3 bedroom homes, 25 terrace houses and 2 bungalows all A2 BER rated.

Construction commenced in June 2023 on a what was a derelict greenfield site that had lain idle where construction had commenced some years previously (by others) and had the remains of house foundations.

In addition to the delivery of 37 housing units, the approved planning permission included a new communal “Natural Play area” amenity and new access roads.

To ensure the safety of the existing residents of the estate, a Traffic Management Plan was developed and signed off by the HSA. Temporary wire fencing was erected around areas deemed unsafe to comply with planning requirements.

Halliday Mills
Halliday Mills
Halliday Mills

Halliday Mills

Apartment Development in Co. Louth

Halliday Mills is a refurbishment scheme that delivered in partnership with McGrath Group.

Value Of Work

€17 Million

Year

2021

Duration

24 Months

Commenced in 2020, the development consisted of 85 one, two and three-bedroom apartments spread over two blocks.

The new development which is located on Quay Street in Dundalk Town Center was warmly welcomed by the people of Dundalk as the property was an ill-fated derelict site for a number of years and now this new building has put a new lease of life into the surrounding area.

The scheme was completed in Q4 2021.

Hebron Road

Hebron Road

Housing Development, Kilkenny

BHA was appointed the main contractor by Hebron Ventures to deliver 58 units on their green field site in Kilkenny City.

Value Of Work

€7.2 Million

Year

2020

Duration

24 Months

The units were a mix of 2 and 3 storey homes as well as 15 apartments across 4 floors. The units were built on strip foundations with rising block walls and plaster finish through out. To assist with the speed of construction the site used Posi joists and roof trusses.

All homes were built to an A2 rating and met the latest design standards for landscaping and amenities. ensure

Working across several Covid shut downs and price increases, BHA managed to successfully deliver the project on time and budget.

Graigue na hAibhainne, Carlow
Graigue na hAibhainne, Carlow
Graigue na hAibhainne, Carlow

Graigue na hAibhainne, Carlow

Housing Development, Carlow

BHA completed a residential project involving the construction of 77 new houses, with most being 3-bedroom semi-detached units.

Value Of Work

€9.7 Million

Duration

25 Months

External walls were constructed using block and brickwork with cavity walls and full-fill bonded bead insulation. Double-glazed PVC windows and doors were installed, and all blockwork walls received a nap plaster finish and paint. Posi Joists were used for joisting, and timber roof trusses, lath & felt, and concrete roof tiles were utilized for roof works. Mechanical aspects included air-to-water heat pumps with radiators, achieving an A2 rating, along with specified sanitary fittings.

Electrical work was fully completed, and carpentry & joinery featured flush timber doors, skirting, stairs, and fitted kitchens. Internal finishes involved plasterboard walls with skim finish and paint, and wall & floor tiling were done in designated areas. External works covered concrete paths, gardens, fencing, and drainage, while development works included in-situ concrete footpaths, line marking, and site services. Landscaping included topsoil, seeding, and planting of shrubs and trees.

The project achieved a BER rating of A2.

Holy Trinity
Holy Trinity
Holy Trinity

Holy Trinity

Residential Development

BHA's completion of Holy Trinity Belgrave for Coram Deo Rathmines stands as a model of excellence in residential development,emphasizing quality while honoring the surrounding heritage.

Value Of Work

€5 Million

Year

2022

Duration

18 Months

The 9-unit scheme not only met but surpassed green and environmental targets, achieving compliance with NZEB standards.

Construction of 9 units (Units A to J), comprising three-story terraced houses (Units A-C) and ground floor apartments and three-story duplex apartments (Units D-J). Units A-C featured 5-bedroom Rectory, 3-bedroom Curate’s house, and 4-bedroom townhouse with private gardens and parking. Units D-J included three-story duplex apartments and 1-bedroom ground floor apartments with various features such as shared gardens and terraces. Associated site development works, landscaping works, new perimeter walls, and railings to road frontages.