At BHA Construction, we take pride in delivering fire remediation solutions that restore safety, confidence, and long-term performance. Our dedicated team works with precision and integrity to bring buildings back into full compliance with current fire safety regulations, ensuring that residents, owners, and stakeholders have complete peace of mind. We understand the complexity and sensitivity of fire remediation projects. That’s why our approach is built on transparency, accountability, and technical excellence. From initial investigation to design coordination, material specification, and construction, we manage every stage with clear communication and attention to detail. Working closely with fire engineers, local authorities, approved inspectors, and building owners, we provide tailored remediation solutions that address issues such as defective cladding, fire stopping, cavity barriers, and compartmentation. Every project is executed with the same commitment to quality workmanship and compliance that defines all BHA work. Our goal is not only to meet fire safety standards — but to exceed them. By combining proven building expertise with robust quality assurance systems, we deliver projects that stand as examples of responsible construction and lasting safety.




The Infinity Building
BHA successfully completed extensive upgrade works to The Infinity Building, Smithfield, Dublin
Fire upgrade and compliance works across a six-storey office building
€2.5 Million
2021
7 Months
BHA delivered a comprehensive programme of upgrade works to The Infinity Building in Smithfield, Dublin, ensuring full compliance with current fire safety standards. The project included fire seal and encasement works, the replacement of dampers within existing risers, and the installation of new fire seals to compartment walls across all six floors. Fire doors were also upgraded, and existing fire alarm issues were resolved through targeted repair and system enhancements. To complete the works, existing walls and ceilings were carefully opened and reinstated to a high standard, with all activities carried out while the building remained fully operational. Meticulous planning and coordination ensured minimal disruption to staff and day-to-day office functions throughout the project.


Olympia Theatre
The protected structure is one of Dublin’s oldest venues for music and entertainment
€860K
2015
20 Weeks
BHA took on the task of the replacement of the Fire Alarm and Emergency exits , which involved strategic planning for the routes for the new services to ensure the least amount of disturbance on the existing building fabric and finishes. Making good to areas disturbed involved replacing with like for like material to match the existing finishes and re-decorating areas to match with the existing.
The venue remained live for the duration of the project and care was taken to work with the Clients to ensure that at the end of each shift the premises could be fully operational.
Project Managers - Mitchell McDermott



City East Retail Park
Large retail park located in Co. Limerick
Fire Upgrade Works to all retail units at City East Retail Park
€1.2 Million
2019
30 Weeks
BHA successfully delivered comprehensive fire upgrade works at City East Retail Park, completed in two meticulously managed phases. Phase 1 focused on the installation and enhancement of cavity barriers, while Phase 2 addressed encasement and fire sealing to all compartment walls between retail units. All works were carried out with minimal disruption to tenants, ensuring the retail park remained fully operational and open for trading throughout the project.



Citywest Shopping Centre
Shopping Centre in Dublin
BHA completed Fire Upgrade Works at Citywest Shopping Centre.
€2.4 Million
2019
8 Months
The works consist of replacing the existing Fire Doors throughout the shopping centre and to all office from Block A to H. Fireseal and encasement works and associated builders works are progressing in Landlord and Tenanted areas. Mechanical and Electrical works are also being upgraded as required by the Client Team.
All works are being completed with as little disruption as possible to all shop units as they remain live for trading while the works are being carried out.
Architect and Designer - The Building Consultancy Group


Cedar Portfolio Projects
75 St. Stephens Green The Watermarque Building 72 Charlemont Street
BHA completed Fire Upgrade Works on the above projects.
€2.5 Million
2015
10 Months
The works consisted of fire seal, structural steel encasement works and damper and duct replacement works to existing basement car parks, risers and fire seal to compartment walls throughout the building.
Existing walls and ceiling had to be opened up and made good to complete these works fir seal works. Replacement of existing with new fire doors. Removal of existing soffit insulations to basement and installation of new. Construction of fire rated bin store areas with Duct ventilation. Mechanical and Electrical upgrade works.
All works are being completed with as little disruption as possible to the building as they remain live while the works are being carried out.